Case study 3 : Logistics Supply solutions for Construction Industry
AZKA provided effective DDP Solutions for supply of construction material to Iraq project site
Project included: Transportation of Cement and Building Material from Door Turkey to Door Iraq
Opportunity for Solutions:
DDP Solutions for supply of construction material
Cost effective solutions to manage the process smoothly
Strategic Solutions offered:
AKZA’s trade license and import permit benefits and the proposed solutions for import of cargo first to Erbil and then arrangement of transfer of goods as local cargo to Balad base
Differential customs duty were offered as solution
Shipments were transloaded onto Iraq bound trucks having permit to access Balad base
Obtaining gate pass to access site was a taken care with sending AKZA’s own truck drivers, who drove vehicles inside camp locations
As an extension of service AKZA team also provided earth moving equipment, trenchers and water tankers on rental basis
Outcome:
Construction material delivered to the site as per schedule
Managed the intermediary challenge with effective alliance partners
Achievements:
AKZA alliance partnerships helped secure the support services at competitive rates, thereby ensuring cost effective solutions were provided to client